Świdnica Mała 16dws 89m2 | Frame house
Usable area: 89 m²
Net area: 111.35 m²
building dimensions: 9.11m x 7.11m
Description Świdnica Mała 16dws
FAMILY HOUSE - LOW ENERGY
The house is a timber-frame structure. On the ground floor, there's a large living room with a kitchenette, fireplace, attic stairs, and access to the terrace. There's a bathroom, utility room, and vestibule. The attic boasts three bedrooms, a bathroom, hallway, and balcony. The building's compact shape and gable roof facilitate quick and cost-effective construction, as well as low operating costs.
Scope of work: Closed shell PLUS
Closed shell PLUS:
Technological project,
Prefabricated external frame walls filled with mineral wool and closed on both sides with Fermacell boards, with conduits for electrical installations installed inside Wall thickness: 16cm, 22cm or 27cm depending on the option selected.
External walls insulated with 10 cm thick polystyrene, + mesh, glue and decorative plaster "lamb" - white, optional for wooden facade: Spruce facade board painted twice with HK Remmers Lasura, with facade wool underneath,
Prefabricated internal frame walls filled with mineral wool and closed on both sides with Fermacell boards, with conduits for electrical installations installed inside Wall thickness: 11cm
Wooden ceiling structure, 45x220, filled with mineral wool and closed at the top with OSB board,
The roof structure is rafter-collar beam, made of dried and planed spruce wood,
Roof covering – Blachotrapez metal roofing tiles, color: anthracite, black or burgundy,
KROP gutters (Manufacturer: Blachotrapez), 2 downpipes,
Installation of prefabricated elements (up to 100 km),
DRUTEX IGLO ENERGY triple-glazed window joinery with assembly, double-sided color to choose from group I,
Steel external window sills,
Entrance doors with installation,
Installation of roofing and gutters,
On the Investor/Ordering Party side:
Construction design and adaptation to the plot,
Reporting construction or obtaining a building permit,
Hiring or taking over the position of construction manager and establishing a construction log,
Preparation of the foundation slab or foundation footings in accordance with the design,
All installations,
Plastering, spackling and sanding of walls and ceilings,
Finishing – painting the walls, whiteware installation,
Making external connections,
Organization/covering the costs of transporting materials, HDS and accommodation for the assembly team.