Świdnica Mała 16dws 89m2 | Frame house
Usable area: 89 m²
Net area: 111.35 m²
building dimensions: 9.11m x 7.11m
Description Świdnica Mała 16dws
FAMILY HOUSE - LOW ENERGY
The house is a timber-frame structure. On the ground floor, there's a large living room with a kitchenette, fireplace, attic stairs, and access to the terrace. There's a bathroom, utility room, and vestibule. The attic boasts three bedrooms, a bathroom, hallway, and balcony. The building's compact shape and gable roof facilitate quick and cost-effective construction, as well as low operating costs.
Scope of work: Closed shell PLUS
Closed shell PLUS:
- Technological project,
- Prefabricated external frame walls filled with mineral wool and closed on both sides with Fermacell boards, with conduits for electrical installations installed inside
Wall thickness: 16cm, 22cm or 27cm depending on the option selected. - External walls insulated with 10 cm thick polystyrene,
+ mesh, glue and decorative plaster "lamb" - white,
optional for wooden facade:
Spruce facade board painted twice with HK Remmers Lasura, with facade wool underneath, - Prefabricated internal frame walls filled with mineral wool and closed on both sides with Fermacell boards, with conduits for electrical installations installed inside
Wall thickness: 11cm - Wooden ceiling structure, 45x220, filled with mineral wool and closed at the top with OSB board,
- The roof structure is rafter-collar beam, made of dried and planed spruce wood,
- Roof covering – Blachotrapez metal roofing tiles, color: anthracite, black or burgundy,
- KROP gutters (Manufacturer: Blachotrapez), 2 downpipes,
- Installation of prefabricated elements (up to 100 km),
- DRUTEX IGLO ENERGY triple-glazed window joinery with assembly, double-sided color to choose from group I,
- Steel external window sills,
- Entrance doors with installation,
- Installation of roofing and gutters,
On the Investor/Ordering Party side:
- Construction design and adaptation to the plot,
- Reporting construction or obtaining a building permit,
- Hiring or taking over the position of construction manager and establishing a construction log,
- Preparation of the foundation slab or foundation footings in accordance with the design,
- All installations,
- Plastering, spackling and sanding of walls and ceilings,
- Finishing – painting the walls, whiteware installation,
- Making external connections,
- Organization/covering the costs of transporting materials, HDS and accommodation for the assembly team.







